9/29

9.28.2014

9/29

 

Fitness

 

A.  hang squat clean–build to a heavy in 12 min

 

14 min AMRAP

-7 hang squat clean @ 60% of A

-7 C2B/pullup (or 14 ring row)

 

then:

pendlay row 5-5-5 or late pull down 10-10-10

 

 

Performance

 

A.  15 min–snatch, build to a heavy single (squat)

 

14 min on clock:

-20 squat snatch 135/95

-20 PC @ 135/95

-20 MU or 60 C2B

-20 box jump over @ 30/24

-AMRAP cal row

 

then:  pendlay row 5-5-5 AHAP