Pardon our dust

2.9.2014

We are excited to be open for our first day at the new location, 3080 Cedar Crest Ct!  I hope you can all pardon our dust through the next few weeks while we finish setting everything up.  We’re pretty much up and ready to go for tomorrow’s work, but there are some things you should all know before you come in…

 

–As of five minutes ago (I just left the box to post the workout for tomorrow), there’s STILL no water due to pipes freezing on the other side of the building.  Hopefully this gets resolved very soon, but worst-case scenario we won’t have working bathrooms at all tomorrow morning.

 

–It’s still a work in progress, so please be cautious of work tools and dust.  I’ll do my best to keep that kind of stuff away from the classes, but there’s still a lot of work left to do.

 

–astroturf is being quoted and will be installed within the next few weeks.  Until then, half of the floor will be bare concrete.  Our usable area right now is about the same size as our entire old space though, so we should be ok!

 

–The new signage will be going up sometime tomorrow, but until then the building isn’t marked.  Trust me–when the sign goes up, you’ll know where CFD is located!

 

Thank you all in advance for your patience and understanding during this transition period.  It’s my biggest goal to not impede on anyone’s training experience during the move, and I’m glad we are able to remain on schedule at least with the workouts and be ready to go at 5:15 tomorrow morning.  I can’t possibly thank all of you enough who made it out this weekend to help it all go as smooth as it did.  It really shows the amazing quality of character so many of you have to come help with such an exciting undertaking.  Thank you all so very much.

 

I’ll see you all bright and early!

 

-Coach Phil